In the case of launching girdgers, we have 2 methods: Underslung and Overhead.
Underslung Method
For long spans, an alternative is cantilever segmental construction. Beam is started in the pier and built up as cantilever in two ways. In this way, cantilevers must be symmetrical. Segements can be cast in situ or precast and erect it on site.
Segmental Construction
Incremental Launching
References:
http://www.nbmcw.com/articles/bridges/2586-launching-systems-for-segmental-bridges.html
0 comments:
Publicar un comentario